Beyond the Torque Wrench: Critical Inspection Points for Steel Connection Fit-Up
Steel connection inspection requires methodical verification of materials, fit-up, and documentation, not just torque.

Tiana Paul
Field Engineer
Introduction: The Integrity of the Load Path
For a structural engineer, the integrity of a steel structure often comes down to the connections. These nodes are where forces are transferred and where failures commonly originate due to poor installation. Site inspection of steel connections goes far beyond simply checking bolt torque; it requires methodical verification of materials, preparation, geometry, and documentation.
The site inspector serves as the critical final line of defense, ensuring that the theoretical design intent translates accurately into the field. This guide outlines the essential phases of steel connection inspection, focusing on pre-fit, fit-up, and post-tensioning requirements.
Section 1: Pre-Fit-Up Checks (Material and Preparation)
Before a single bolt is tensioned, the inspector must confirm the quality of the components and the receiving surfaces. Failure in this phase guarantees problems later.
Key Pre-Fit Requirements:
Material Certification (MTRs): Verify that all high-strength bolts, nuts, and washers conform to the specified ASTM standards (e.g., F3125 Grade A325 or A490) and possess valid Mill Test Reports (MTRs).
Surface Preparation (Slip-Critical Joints): For slip-critical connections, inspect the contact surfaces (faying surfaces). They must be free of paint, oil, dirt, or other foreign matter that would reduce friction. Verify the surface preparation matches the required Slip Coefficient (e.g., near-white blast cleaning).
Hole Alignment: Visually check that bolt holes in all plies are aligned correctly. Slight misalignments (up to 1/16 inch or 2mm for standard holes) may be permissible, but excessive misalignment indicates fabrication errors requiring immediate correction (reaming, not torching).
Washer Use: Confirm the correct quantity and type of washers (e.g., hardened washers under the element being turned, typically the nut).
Section 2: Critical Fit-Up Observations (Geometry and Seating)
The fit-up phase is the core of the inspector’s responsibility. This determines the actual load path transfer and the behavior of the connection under stress.
Required On-Site Verification:
Plumbness and Alignment: Confirm that the column or beam being erected is plumb (vertical) or aligned correctly before connection bolts are tightened. Excessive force required to draw members into alignment can induce unwanted internal stresses.
Bolt Seating and Snug-Tightening: Verify that all bolts in the connection are present and installed correctly (washers positioned properly). The initial "snug-tight" condition must be achieved—this is defined as the point where all plies in the joint are brought into firm contact. This condition is crucial before final tensioning.
Gap Limits: Inspect the gaps between plies. While small gaps may be unavoidable, gaps exceeding specifications (AISC recommendations often cite limits like 1/16 inch) must be noted. Gaps compromise the effective transfer of forces.
Temporary Support Removal: Ensure temporary erection clips, shims, or braces used during fit-up that are not part of the permanent structure are removed before final tensioning begins.
Section 3: Post-Tensioning and Documentation
The final inspection phase involves verifying the applied tension and accurately documenting the verification process.
Post-Tensioning Checks:
Tensioning Method Verification: The inspector must confirm the tensioning process used (e.g., Turn-of-Nut, Calibrated Wrench, Twist-Off Bolts) matches the project specifications and the correct technique is followed by the installation team.
Visual Inspection (Final Status): Confirm that paint or other coatings applied after fabrication have not interfered with the nut/bolt contact area and that the final appearance indicates proper tensioning (e.g., visual confirmation of the spline breaking on Twist-Off bolts).
Grouting and Fireproofing Readiness: Note the final status of the connection relative to subsequent work, such as column base plate grouting or fireproofing application.
The Importance of the Record:
The inspection record must capture the state of the connection at every critical point: pre-assembly, snug-tight, and final tension. This documentation is essential because, unlike concrete strength, bolt tension cannot be easily verified non-destructively once the structure is operational. Accurate, time-stamped reporting is the only proof of compliance.
Disclaimer: This content is for educational purposes only and does not constitute engineering advice. Always refer to current AISC, ASTM, and local building code standards for specific project requirements.